As contract District Engineer for the Bodega Bay PUD, Coastland provides on-call capital design and construction management services on all of the District’s improvements.
Coastland has assisted in the preparation of a five-year Capital Improvement Program, several capital projects including replacement and upgrading of the sewer collection system, replacement of the District’s water and sewer SCADA system, evaluation of the overall collection system (including CCTV inspections and condition ratings, cost estimates and prioritization), evaluation of the District’s wastewater treatment plant and reclaimed water system and preparing inflow and infiltration studies.
Construction management and inspection services have also been provided for pipeline replacement projects, emergency sewer line repairs, SCADA upgrades, treatment plant building replacements, installation of the Bay Flat Well and other District projects.